Feature Summary and Revision History
Summary Data
Applicable Product(s) or Functional Area |
|
Applicable Platform(s) |
|
Feature Default |
Disabled - Configuration Required |
Related Changes in This Release |
Not Applicable |
Related Documentation |
|
Revision History
Revision Details |
Release |
---|---|
P-GW and S-GW supports secondary RAT usage reports and CDRs processing through GTPP Group Configuration CLIs. |
|
P-GW and S-GW supports secondary RAT usage reports and CDRs processing through GTPP Group Configuration CLIs. |
21.20.31 |
First Introduced. |
21.22.n7 |